PROJECTS.

Green Mountain, Wyoming.

GTI recently acquired 13,800 acres of claims at Green Mountain in Wyoming close to GTI’s existing GDB projects & adjacent to Energy Fuel’s 30Mlb Sheep Mountain, Ur-Energy’s Lost Soldier, Rio Tinto’s Jackpot & UEC’s Antelope deposits. The Green Mountain Project contains a number of uranium mineralised roll fronts hosted in the fertile Battle Springs formation. GTI plans to use historical drilling records to guide exploration. The properties lie close to existing GTI claims.

Location of The Green Mountain Project

Historical Kerr McGee drill data and oil-well exploration drill logs confirm the presence of roll fronts & the Battle Springs formation which hosts neighbouring major uranium deposits. The Properties are located in the neighbourhood of Energy Fuel’s (EFR) 30Mlb Sheep Mountain deposit (refer Schedule 1), Ur- Energy’s (URE) Lost Soldier ISR deposit, UEC’s (UEC) Antelope deposit & Rio Tinto’s (RIO) Big Eagle (past producing), Jackpot, Desert View, Phase II, & Willow Creek deposits. The Claims lie south of Green Mountain, ~5kms from GTI’s existing Odin claim group & within 15km of GTI’s Thor project where a successful maiden drill program was completed during May 2022.  

  • The Properties are located within economically viable transportation distance from both GTI’s existing land holdings and several significant uranium deposits and or processing facilities held by the neighbouring Rio Tinto, Energy Fuels, UEC and Ur-Energy. 
  • Notable nearby deposits include Energy Fuel’s (EFR) 30Mlb Sheep Mountain deposit, Ur- Energy’s (URE) Lost Soldier ISR deposit, UEC’s (UEC) Antelope deposit & Rio Tinto’s (RIO) Big Eagle (past producing), Jackpot, Desert View, Phase II and Willow Creek deposits.
  • The GDB/Green Mountain area was extensively explored by drilling in the 1970’s and early 1980’s by major US companies including Kerr McGee Uranium, Conoco Minerals, Phillips, Wold Nuclear, Union Carbide, Occidental Petroleum, Western Nuclear and Pathfinder Mines. 
  • A review of historical Kerr McGee drill data and oil-well exploration drill logs confirms the presence of roll fronts & the Battle Springs formation which hosts neighbouring major uranium deposits.

 

* The acquisition of the Green Mountain project is estimated to settle during June 2022

KEY PROJECTS.

Subscribe here to receive the latest news and updates.