NEWS.

Positive Start to Wyoming ISR Uranium Drilling at Thor.

Highlights

  • Two rigs in operation at GTI’s Thor ISR uranium prospect
  • First 25 holes completed of the 40,000ft (~12,200m) ~70-hole drill program
  • 17 out of 25 holes met or exceeded the target uranium grade cut-off
  • Mineralisation conducive to ISR recovery with water table 100-200 ft above host sands
  • 1,830 ft of new mineralised roll fronts found to date for a total of 19,470 ft (3.69 miles)
 
“Results from the first 25 holes strongly justify this follow-up campaign at Thor. The historical drill maps combined with interpretation from our previous drilling have generated a high strike rate. The mineralisation identified continues to show potential for ISR development as we extend our understanding of the roll fronts and work towards a resource report. We look forward to continuing exploration over the coming weeks and months when conditions for US domestic uranium, particularly in Wyoming, continue to strengthen.”
 
Bruce Lane
Executive Director

Latest NEWS.

Subscribe here to receive the latest news and updates.