NEWS.

Results of Rights Issue

GTI’s fully underwritten rights issue closed last week with a 41% uptake which is a positive result. Thanks to all shareholders that took up their rights or subscribed for additional shares.

Read More

Quarterly Activities Report

GTI Energy Ltd (GTI or Company) is pleased to report on its activities in the March 2023 quarter.

Read More

LO HERMA URANIUM PROJECT ON TRACK FOR Q2 JORC RESOURCE

GTI Energy Ltd (GTI or Company) is pleased to provide an update on its progress towards
reporting an Inferred Mineral Resource Estimate

Read More

Investor Presentation Livestream: Future Facing Commodities Conference, Singapore

https://www.gtienergy.au/wp-content/uploads/2023/04/RCA23_GTI-Energy.mp4 Click to View the Full Presentation Click for the Presentation Live Stream

Read More

Maiden Mineral Resource at Great Divide Basin Projects

Highlights Inferred Mineral Resource of 1.66 Mlbs U3O8 for Great Divide Basin Prospects Initial Exploration Target range estimated at Great Divide Basin Prospects 200 additional claims (~4,000 acres) staked at …

Read More

Annual Report to Shareholders

Click for the Full ASX Announcement

Read More

FULLY UNDERWRITTEN RIGHTS ISSUE

GTI Energy Ltd (GTI or Company) is pleased to advise that existing shareholders, on the record date, will be offered the opportunity to participate in a non-renounceable pro-rata rights entitlement offer

Read More

GTI SECURES DRILLING DATA WITH REPLACEMENT VALUE OF $15m FOR LO HERMA TO ACCELERATE JORC U3O8 RESOURCE FOR Q2 – RAISES CAPITAL

Highlights Historical drilling data with an estimated replacement value of ~$15million1 acquired for Lo Herma including drill logs for 1,445 drill holes (~530,000 ft). representing 7 x the holes, & …

Read More

GTI Secures Significant New Uranium Project In Wyoming, 10 Miles From Cameco’s Smith Ranch-Highland ISR Uranium Facility

GTI Energy Ltd (GTI or Company) is pleased to advise that it has secured unpatented mineral
lode claims covering circa 8,000 acres (~3,500 hectares), known as the Lo Herma Project, in
Wyoming’s prolific Powder River Basin uranium district (Figures 1 & 2) (Lo Herma Project).

Read More

Airborne Geophysics for Green Mountain in April & Maiden Uranium Resource for Great Divide Basin on Track for End of March

GTI Energy Ltd (GTI or Company) is pleased to advise that Terraquest Ltd has been engaged to deliver an airborne geophysical survey at GTI’s 100% owned Green Mountain Project in Wyoming. The survey is expected to commence during April 2023

Read More

Quarterly Activities Report

Highlights Total projected roll front trends at GTI’s GDB projects increased to 7.5 miles (39,614 ft) New mineralised trend found within lease Section 29 with best hole a strong GT …

Read More

Drilling Update – New Uranium Roll Front Confirmed at Loki

GTI Energy Ltd (GTI or Company) advises that drilling at Company’s ISR uranium projects in
Wyoming’s Great Divide Basin (GDB or Basin) is now finished for the 2022 season with 103 mud
rotary exploration drill holes completed.

Read More

GTI Energy identifies more roll front uranium mineralisation in Wyoming

GTI Energy Ltd (executive director Bruce Lane says new roll front trends have been identified in drilling at the Teebo and Odin prospects. Four drill rigs are in operation with two working at Loki prospect and two more operating at Teebo with 18 of the latest 22 drill…

Read More

New Roll Front Trends Identified at Teebo & Odin

GTI Energy Ltd (GTI or Company) is pleased to advise that four mud rotary drill rigs are now
working at the Company’s ISR uranium projects in Wyoming’s Great Divide Basin with 22 holes
completed to date of a planned ~65-hole campaign.

Read More

GTI Energy featured in the 2023 Stockhead Energy Investor Guide

GTi Energy has been featured in the Stockhead Energy Investor Guide for 2023. This guide is published on the Stockhead website as well as in the Australian Newspaper.

Read More

Uranium Virtual Investor Conference Presentation

Focussed on defining and developing economic ISR uranium resources in Wyoming – GTi is part of the US nuclear renaissance.

Read More

Executive Director Bruce Lane Interview with Proactive

GTI Energy Ltd (ASX:GTR) executive director Bruce Lane speaks with Proactive’s Andrew Scott about the company’s drilling program at the Thor prospect in Wyoming’s Great Divide Basin (GDB) which revealed …

Read More

Executive Director Bruce Lane Presenting updated GTi Energy Presentation

Live stream the GTI Energy Ltd. (OTCQB: GTRIF | ASX: GTR) presentation from our November 8, 2022 Uranium Virtual Investor Conference.

Read More

Thor Drilling Results – New Roll Front Trend Discovered

GTI Energy Ltd (GTI or Company) is pleased to advise that two mud rotary drill rigs have now completed 70 holes, for 34,010-feet (10,366 metres), of its planned ~100,000-foot drill program in Wyoming’s Great Divide Basin. Drilling is completed at the Thor prospect where a total of 34,010 feet (10,366 metres) was drilled for 70 completed holes.

Read More

Quarterly Activities Report

GTI’s ISR uranium projects are located in the Great Divide Basin in Wyoming, USA and comprise a total area of ~35,000 acres (~14,000 hectares) across several groups of strategically located and underexplored mineral lode claims and two state leases

Read More

Significant New Uranium Trends Discovered, Best Hole of 2.55 GT

GTI Energy Ltd (GTI or Company) is pleased to advise that 2 mud rotary drill rigs have now
completed the first 40 holes, for 20,370-feet (6,209 metres), of its planned 100,000-foot drill
program in Wyoming’s Great Divide Basin.

Read More

GTI Energy hits the ground running with Thor ISR uranium drilling

The results to date meet the company’s expectations for economic ISR uranium recovery and confirm the historical data it’s using to guide the program. GTI Energy Ltd (ASX:GTR) is off to a strong start in the hunt for uranium at the Thor in-situ recovery (ISR) prospect in Wyoming’s Great Divide Basin.

Read More

Positive Start to Wyoming ISR Uranium Drilling at Thor

Drilling has commenced at the Thor prospect (Thor), located adjacent to Ur-Energy Inc’s (URE) 18Mlb Lost Creek uranium deposit and operating ISR uranium processing plant.

Read More

GTI Energy’s closely watched uranium drilling is now underway

Drilling is underway at GTI’s Thor ISR uranium prospect in Wyoming’s Great Divide Basin, to test known roll fronts for mineralisation suitable for in situ recovery mining (ISR).

Read More

GTI Energy readies for September drilling at Great Divide uranium project

GTI Energy Ltd (ASX:GTR) has all the necessary permits and bonds in place to kickstart drilling at its Great Divide Basin in-situ recovery (ISR) uranium project in Wyoming.

Read More

GTI Energy on the OTCQB Podcast

Bruce from GTI Energy sits down with Cecilia on the OTCQB Podcast to discuss all things GTI Energy.

Read More

GTI Energy’s new executive director to guide US commercial activities

GTI Energy Ltd (ASX:GTR) has brought on board as executive director James (Jim) Baughman, a highly experienced Wyoming uranium geologist and corporate executive who will help guide GTI’s technical and commercial activities in the US.Baughman, QP (SME-RM) GDB/Red Desert…

Read More

GTI Energy sells Niagara Gold Project to Regener8 as part of IPO deal

GTI Energy Ltd (ASX:GTR) welcomes the news that spin-off Regener8 Resources NL has closed its IPO, having raised $4.5 million. This signals the conclusion of a deal with the new ASX-lister to acquire GTI’s gold holding, the Niagara Gold Project in WA, upon its debut, with shares in Regener8 forming part of the sale terms.

Read More

GTI Energy completes acquisition due diligence on Green Mountain ISR Uranium Project in Wyoming

Due diligence on Logray and the properties has now been completed and the company expects settlement of the acquisition to take place during the first week of June, following a general meeting on May 27.

Read More

GTI Energy readies for 100,000-foot Wyoming ISR uranium drill program in July

GTI Energy Ltd (ASX:GTR)’s Bruce Lane speaks to preparations for roughly 100,000 feet of drilling at the company’s in-situ recovery (ISR) uranium projects in Wyoming’s Great Divide Basin. Around 40,000 feet of follow-up drilling will commence in July at the Thor project in the northeast corner before maiden drilling kicks off at the nearby Wicket, Teebo, Odin and Loki projects.

Read More

GTI Energy’ shareholders offered priority on Regener8 Resources IPO

GTI Energy Ltd (ASX:GTR) is offloading its non-uranium assets, one of which is the Kookynie Gold Project to be acquired by Regener8 Resources during that company’s listing to the ASX.

Regener8 has made a priority offer to GTR shareholders in tandem with the lodging of a prospectus with ASIC to raise up to $5.5 million for its initial public offering (IPO).

GTI Energy is divesting non-core assets to focus on its highly prospective uranium assets in the US while retaining a material shareholding and board representation in a well-funded entity (Regerner8) focused on gold exploration in Western Australia.

Read More

GTI Energy adds to US uranium portfolio with Green Mountain acquisition and A$5 million raise

GTI Energy Ltd (ASX:GTR) will pick up nearly 14,000 acres worth of contiguous ISR uranium exploration claims in Wyoming’s Great Divide Basin.

The claims neighbour mining stalwart Rio Tinto’s uranium properties and will increase GTI’s landholding in the region to around 35,000 acres.

To support its endeavours in the uranium basin, GTI intends to raise A$5 million via a placement.

Read More

GTI Resources’ maiden drilling results exceed expectations and confirm discovery at Thor Uranium Project

GTI Resources Ltd (ASX:GTR) has completed its maiden drilling program at Thor ISR Uranium Project in Wyoming’s Great Divide Basin and has identified mineralisation “with economic potential based on widths, grades and depth”.

This program of 100 drill holes for 48,540 feet (~15,000 metres) of drilling, which was completed on time and within budget, encountered mineralised roll fronts covering 17,640 feet of the project area, indicating great potential for in-situ recovery (ISR) uranium mineralisation.

The Perth-headquartered mining company with a focus on the exploration of uranium and gold assets, says drilling on the main host sand showed at least three separate roll fronts.

Read More

GTI Resources completes drilling at Thor ISR Uranium Project in US

GTI Resources Ltd (ASX:GTR) has completed drilling a 100-hole maiden exploration campaign at Thor ISR Uranium Project in Wyoming’s Great Divide Basin (GDB) in the US.

GTI holds 100% of ~22,000 acres (~8,900 hectares) across several groups of strategically located and underexplored mineral lode claims and two state leases, prospective for sandstone-hosted uranium that is amenable to low cost, low environmental impact ISR mining.

The ~15,000-metre maiden drill program was completed on schedule and within budget at a time when the uranium spot price is surging, having recently moved past an 11-year high of US$60 per pound.

Read More

GTI Resources on track to complete Thor uranium drilling in mid-March

GTI Resources Ltd (ASX:GTR) remains on track to complete an extensive drill program at its Thor ISR uranium asset in Wyoming’s Great Divide Basin by mid-March.

Two mud rotary drill rigs recommenced the maiden campaign in February, aiming to complete the remaining 60 holes in GTI’s planned 15,000-metre, 100-hole drill programs.

Now, there are just nine holes to drill, and the uranium explorer says these are on track to wrap up by the middle of next week.

Read More

GTI Resources recommences drilling at Thor ISR Uranium Project in Wyoming’s Great Divide Basin

GTI Resources Ltd (ASX:GTR) has recommenced drilling to complete the balance of the 100‐drill hole exploration campaign at the Thor ISR Uranium Project in Wyoming’s Great Divide Basin.

Results to date confirm the discovery of a significant uranium mineralised system with strong economic potential.

The remaining 60% of drilling program will further test the newly discovered mineralised uranium system at Thor.

Read More

GTI Resources to focus solely on uranium after it divests gold assets

GTI Resources Ltd (ASX:GTR) has entered into a binding agreement with Regener8 Resources NL for the sale of certain Western Australian tenements, comprising GTR’s Niagara Gold Project near Kookynie.

GTR has conditionally agreed to sell its 100% interest in the project to Regener8 subject to conditions including shareholder and regulatory approvals.

The divestment of GTR’s gold assets, will enable the company to focus on its highly prospective US uranium assets.

Read More

GTI Resources to resume field preparation as it readies for drilling at Thor ISR Uranium Project in Wyoming

GTI Resources Ltd (ASX:GTR) is about to kick off its 2022 work program at Thor ISR Uranium Project in Wyoming, USA, as it prepares to complete the remaining 60-odd holes of a planned 100‐hole maiden drill program.

Field reconnaissance is scheduled to begin next week with two mud rotary drill rigs to be mobilised, weather permitting, to finalise the 15,000-metre drill campaign.

“Drill results so far show that there is a strongly mineralised uranium system at Thor with potential for development,” executive director Bruce Lane said.

Read More

GTI Resources well positioned to advance Wyoming uranium assets

GTI Resources Ltd (ASX:GTR) has ended the December quarter in a strong financial position raising $2 million in new capital and with $4.75 million in hand as it drives exploration at its new acquired Thor ISR Uranium Project in Wyoming’s Great Divide Basin.

During the quarter, the company received encouraging results from Thor, demonstrating characteristics conducive to ISR recovery from its 100-hole drilling campaign at the uranium property, with 39 holes completed to date.

Further, the company has completed the acquisition of Branka Minerals Pty Ltd and its Wyoming ISR uranium exploration properties.

Read More

GTI Resources receives further encouraging results from Thor ISR uranium property

GTI Resources receives further encouraging results from Thor ISR uranium property
“We’re delighted with the performance of the geological team and the drill crew in Wyoming, and we look forward to more good results after the Christmas break,” says executive director.

GTI Resources Ltd – GTI Resources reports further encouraging results from Thor ISR uranium property
Mud rotary drill rigs, ancillary equipment and support vehicles at the Thor Project.
GTI Resources Ltd (ASX:GTR) has completed another 15 drill holes at the Thor in-situ recovery (ISR) uranium project in Wyoming’s Great Divide Basin.

The explorer is in the middle of a 100-hole drilling campaign at the uranium property, where it has completed 39 holes to date.

Of those, 19 have met or exceeded a grade thickness (GT) cut-off, averaging 0.60 GT.

Read More

GTI Resources drilling continues to intersect uranium conducive to in situ recovery at Thor Project

GTI Resources Ltd (ASX:GTR) has completed 24 holes of its ~15,000 metres ~100-hole maiden drill program within Exploration Area 1 at the Thor ISR (in situ recovery) Uranium Project in Wyoming’s Great Divide basin.

10 of the 24 holes (42%) drilled to date with two mud rotary drill rigs have met or exceeded the grade thickness (GT) cut-off with an average of 0.68 GT (typical economically viable ISR grade and GT cut‐offs are: 0.02% (200ppm) uranium and 0.2 GT).

These results are in line with expectations and are viewed by GTI as indicative of the high potential for economic ISR uranium mineralisation.

Read More

GTI Resources makes positive start to maiden uranium drilling program in Wyoming

GTI Resources Ltd (ASX:GTR) has made a highly encouraging start to its maiden drilling program at the Thor ISR Uranium Project in Wyoming’s Great Divide Basin with mineralisation meeting expectations for economic ISR recovery.

Positive results have been returned from the first 10 holes of a program of about 100 holes for around 15,000 metres with five holes meeting both grade and GT (grade + thickness) cutoff for an average GT of 0.99.

Two mud rotary drill rigs were used to drill the first of a planned 100-hole program at exploration area 1 at the Thor ISR project.

Read More

GTI Resources commits to becoming carbon neutral

GTI Resources Ltd (ASX:GTR) has committed to become operationally carbon-neutral.

Having reviewed options to reduce and offset residual carbon emissions from its drilling program in Wyoming and from ongoing day to day operations, GTR has made the decision to acquire and eventually retire Australian Carbon Credit Units (ACCUs or carbon credits).

GTR has acquired 450 carbon credits from the East Kimberley Nyaliga Fire Project in WA, which was registered as an eligible offset project in 2017 by Nyaliga Aboriginal Corporation.

Read More

GTI Resources kicks off drilling at Thor ISR Uranium Project in Wyoming

GTI Resources Ltd (ASX:GTR) has started drilling at the Thor ISR Uranium Project in Wyoming’s Great Divide basin with two mud rotary drill rigs.

The 50,000‐foot (around 15,000 metres) maiden drill program of about 100 holes is designed to confirm the grade and tenor of uranium mineralisation that was previously identified by Kerr McGee in the 1980s and to ultimately support the definition of an economic ISR uranium resource.

Read More

GTI Resources adopts global ESG World Economic Forum reporting standard

GTI Resources Ltd (ASX:GTR) has confirmed its focus on clean energy with the adoption of internationally recognised Environmental, Social and Governance (ESG) Stakeholder Capitalism Metrics framework created by the World Economic Forum (WEF).

The framework is based on 21 core metrics and disclosures, designed to provide common metrics that allow consistent reporting of sustainable value creation.

Read More

GTI Resources secures two drill rigs for US uranium project

GTI Resources Ltd (ASX:GTR) has secured two mud rotary drill rigs for its planned drilling campaign at the Thor ISR uranium project in Wyoming’s Great Divide Basin.

GTI is on track to begin its maiden drilling program in December as it looks to confirm the grade and tenor of uranium mineralisation that was previously identified by Kerr McGee in the 1970 and 1980s and to support the definition of an economic uranium resource.

Read More

GTI Resources receives drilling approval for Thor ISR Uranium Project in Wyoming

GTI Resources Ltd (ASX:GTR) is now approved to drill at the Thor ISR Uranium Project in Wyoming’s Great Divide Basin.

A 15,000-metre drill program will take place in December at the Thor project with the bonding process underway and contractor bids received for the mud rotary drilling campaign.

The campaign is due to begin on December 21 this year.

Read More

GTI Resources schedules uranium exploration fieldwork for Henry Mountains Project in Utah

GTI Resources Ltd (ASX:GTR) has scheduled further fieldwork next month at Section 2 and Rat Nest prospects within the Henry Mountains Uranium and Vanadium Project, Utah, USA.

The proposed fieldwork program in the East Exploration Target area includes geological mapping, mapping of existing underground adits and locating and logging of additional existing shallow drill holes.

Importantly, this phase of fieldwork will help guide drill targeting for GTI’s drill campaign in the March quarter of 2022.

Read More

GTI Resources well-funded to advance historical uranium and gold assets in US and Western Australia

GTI Resources Ltd (ASX:GTR) made strong progress in the half-year ended June 30, 2021, and is well-funded as it gears up to explore historical uranium and gold assets in the US and Western Australia.

The company has a large holding in the Niagara gold mining district of Western Australia that offers an opportunity to test the historically mined area using modern exploration techniques.

GTI also has 1,500 hectares in the Henry Mountains region of Utah, USA, where the company plans to advance a uranium project to supply high-grade uranium ore to help fill existing local mill processing capacity.

Read More

GTI Resources acquires prospective ISR uranium projects in Wyoming

GTI Resources Ltd has signed a binding agreement to acquire 100% of Branka Minerals Pty Ltd, the holder of around 22,000 acres of land across several underexplored mineral lode claims in the US states of Wyoming and Colorado.

The projects are highly prospective for sandstone-hosted roll front uranium mineralisation amenable to In Situ Recovery (ISR).

Upon completion, GTI will control the largest non-US, Russian or Canadian owned uranium exploration landholding in Wyoming’s Great Divide Basin (GDB), which is near UR Energy Inc’s Lost Creek ISR facility and Rio Tinto Limited’s Sweetwater/Kennecott Mill.

Read More

Subscribe here to receive the latest news and updates.